Obtain an increased sanctioned load

Reported on September 4, 2010 from Mumbai , Maharashtra  ι Report #30863

The going rate - as per the middleman - for increasing the sanctioned load is Rs. 2500 per KW of increased load. Our meter was rated at 7 KW in order to increase it to 15 KW we paid Rs. 20000. At the MSED office in Navi Mumbai bribery is institutionalized with a "published" rate for different transactions and depening on the number of desks that need to approve the same.