• Bribe Fighter
  • 13 years ago
  • 4414 views

For last one year supply by temp. wire

Reported on January 26, 2011 from Pondicherry , Pondicherry  ι Report #32572

Without checking the cable fault The officials orally asking me 50 meter cable and other materials without a written order for reconnection through the roadside. As it is not my duty, I refused to supply the cable. So for the last one year we get the power supply by temporary wire from the next building.

What is your reaction after reading this report?